Skip to main content

EPC D-to-C improvement estimator | Homecode

Can recommendation costs guarantee an EPC D-to-C rating?

Add official EPC recommendation guidance costs without assuming a rating uplift. Transparent H2 sources, missing-data handling and no invented prices. This calculator does not choose measures or predict a new rating. Review the data sources.

What the estimate means

  • Choose only recommendations that appear on your own EPC. This page cannot confirm that a row belongs to a particular property.
  • Every displayed amount or bound comes from the validated H2 production catalogue.
  • A total is arithmetic, not a quotation, specification, saving or rating forecast.
  • Missing bounds stay missing. The calculator does not insert a typical price or midpoint.

Official guidance costs are not available

The H2 production improvement catalogue is missing. Category names alone do not contain official guidance costs, so the estimator is disabled.

No substitute recommendations, prices or fixture values have been inserted. Try again after the H2 production data is connected.

Data source and freshness

H2 taxonomy version
1.0.0
Taxonomy categories
40
Production catalogue
Not available

Taxonomy sources

  • Energy Performance of Buildings Data England and WalesPublic recommendations data and field namesAccessed: 12 August 2026View source
  • RdSAP10 Specification, Table 33Recommendation measure and recommendation-number referenceVersion: 10 June 2025Accessed: 12 August 2026View source
  • SAP 2012 9.92, Appendix THistorical recommendation wording represented in the open datasetVersion: 9.92Accessed: 12 August 2026View source

Methodology and uncertainty

  1. The route accepts only schema-major-1 H2 taxonomy and production catalogue data. Fixture-marked, mismatched or malformed data is rejected.
  2. You choose the rows. The tool does not infer what a property needs from its current band, and it does not read this property’s certificate.
  3. Source minimums and maximums are added separately. A side of the total is withheld if any selected row lacks that bound.
  4. No per-measure EPC points, savings, payback, grant, VAT treatment or site-specific scope is assumed.

Guidance can differ from a contractor’s quotation because access, condition, design and necessary enabling work are property specific.