Do this first

Your safe boundary

Keep any restricted circuit off, preserve the complete report and do not open equipment, alter a code or carry out the investigation or remedial work yourself.

C1 means danger present, C2 means potentially dangerous, FI requires investigation without delay and C3 is an improvement recommendation.

No verified cost range is available for this page.

Safety warnings

What is known — and what is not

What is known

  • Only the page's recorded observations, documents and stated scope are treated as known.

What remains uncertain

  • The code states risk priority, but it does not by itself define the final method, quantity or access requirement. [1][2]

Possible explanations

  • a documented immediate-danger observation [1][2]
  • a documented potentially dangerous observation [1][2]
  • a documented need for further investigation [1][2]
  • a documented improvement recommendation [1][2]

Property decision

  • Sale: Electrical Safety First says an EICR is not legally required solely to sell a property, but it can provide safety evidence and relevant electrical-work certificates remain important. [5][4]
  • Letting: for an in-scope rented home in England, C1 and C2 require remedial work, FI requires investigation and the qualified-person deadline is 28 days or any shorter period in the report. [1][2]
  • Next professional: return first to the report issuer for clarification, then use a qualified person competent for each investigation or remedial item. [3][1]

What the codes mean

  • C1: danger present and risk of injury; immediate make-safe and remedial action is the priority. [1]
  • C2: potentially dangerous; the installation report is unsatisfactory and urgent remedial work is required. [1]
  • FI: further investigation is required without delay; the affected condition and necessary response must not be guessed before that investigation. [1]
  • C3: improvement recommended; C3 alone does not require remedial work for the report to be satisfactory. [1]

What you can check safely

  • Read the overall result, next-inspection date, every observation and any shorter deadline exactly as written. [1][2]
  • Match each code to the report's location and circuit reference without opening electrical equipment. [3]
  • Gather previous EICRs, Electrical Installation Certificates, Minor Works certificates and Building Regulations evidence. [4][1]

When to stop

Do not re-energise a circuit made safe by the inspector, open accessories or the consumer unit, conduct a DIY EICR, downgrade or hide a code, or delay a C1, C2, FI or shorter report deadline. [3][2]

Next step

Request an itemised schedule that separates C1, C2, FI investigation and optional C3 improvement, then retain the satisfactory report or other appropriate qualified-person confirmation after completion. [1][2]

When electrical work must stop

  • If there is exposed or damaged wiring, arcing, scorching, smoke, a burning smell, repeated trips, electric shock, or electrical equipment in contact with water, keep away and stop. Switch off only if a normal control is safely reachable without approaching the hazard. [6]
  • In England, Approved Document P says notifiable work includes installing a new circuit, replacing a consumer unit, or any addition or alteration to existing circuits in a special location such as the defined space around a bath or shower, or a room with a swimming pool or sauna heater. [4]
  • Notifiable work must be certified by a registered competent person, a registered third-party certifier, or a building control body. Do not open, alter or test fixed wiring yourself. [4]
  • Even work that is not notifiable should still be designed, installed, inspected and tested. A visual check or an RCD trip does not prove that an installation is safe. [4]

Evidence checkpoints

  • England government guidance defines C1 as danger present, C2 as potentially dangerous and FI as further investigation required without delay. [1]

    Evidence date:

  • C3 is an improvement recommendation and does not by itself require remedial work for the EICR to be satisfactory. [1]

    Evidence date:

  • For an in-scope rented home in England, required investigation or remedial work must be completed within 28 days or the shorter period stated in the report. [2][1]

    Evidence date:

  • Electrical Safety First says an EICR is not a legal requirement solely in order to sell a property. [5]

    Evidence date:

  • Approved Document P for England lists a new circuit, a consumer-unit replacement, and additions or alterations in a special location as notifiable electrical work. [4]

    Evidence date:

Scope and safety review

This resolved route covers an EICR for an England home; the rented-home duties apply only to an in-scope specified tenancy, and a report code alone is not treated as a separate active electrical-danger fact.

Jurisdiction
England
Who this covers
adult resident
Tenure
owner-occupied, private rented, social rented
Reviewed

Sources

  1. Electrical safety standards in the private and social rented sectors: guidanceMinistry of Housing, Communities and Local Government. Accessed .
  2. The Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020: regulation 3legislation.gov.uk. Accessed .
  3. Introduction to electrical safetyHealth and Safety Executive. Accessed .
  4. Electrical safety: Approved Document PMinistry of Housing, Communities and Local Government. Accessed .
  5. Your questions answeredElectrical Safety First. Accessed .
  6. Frequently asked questions (FAQs)Health and Safety Executive. Accessed .